Upper Indravati Hydro Electric Project
(Kapur Earthen Dam, Podagada Earthen Dam, Diversion Cum Depletion Tunnel, Head Race Tunnel & Masonary Dam)
Orissa
Construction of earthen dam of 537 mts. and 65 mts. at Kapur in the year 1994.
Construction of earthen dam and diversion tunnel of 462 mts. and 72 mts. at Podagada in the year 1996.
Construction of horseshoe shaped diversion tunnel cum depletion outlet 3.5 mts. diameter and 356 mts. at Right Dyke in the year 1997.
Completion of balance work of head race tunnel ( 4 Km. long and 7 mts. diameter) and construction of masonry dam of 65 mts. height, 500 mts. at Muran in the year 1999.
Larji Hydro Electric Project
(Head Race Tunnel & Barrage)
Himachal Pradesh
This project includes construction of head race tunnel of 8.50 M Diametre at Kullu in the year 2004
construction of diversion barrage intake & de-sanding arrangements, coffer dams, de-sanding basins, gate operation galleries, intake structures, gate operation galleries and single gate gallery and 14 Nos. of audit, feeder, d-shaped flushy & connecting tunnels at Kullu 2004.
Parbati Hydro Electric Project
Haryana
Construction of civil and hydro-mechanical works for head race tunnel and associated works at Faridabad, the tunnel is in progress and is being executed for National Hydroelectric Power Corporation Limited, Haryana.
B G Tunnel
Assam
Single line B G including earthwork in filling and cutting and construction of two nos. minor bridges, side drains and other protection works at approaches of tunnel, total length of tunnel is 2596 RM at Maligaon, Assam. This project for Northeast Frontier Railway in under progress.
Hinduja Power Plant
Andhra Pradesh
A Thermal Power Plant including site grading work of 2 X 250 MW plant was executed in the year 2000 for Hitachi Limited, Visakhapatnam. |