Energy generation projects are another mainstay at Maytas Infra. We engage ourselves in a variety of ways in this area including wholly-owned projects, collaborations, and joint ventures. We have executed several projects of repute in this segment which have been recognised not just for the quality, but for the ingenuity applied in planning and executing them. Our expertise ranges in the following areas:

  • Hydel Power
  • Thermal Power
  • Power Transmission and Distribution
  • Oil and Gas including pipelines

Hydel Power
Kalpong Hydro Electric Project

This project in Andaman was completed in just two years’ time and includes a concrete dam, a rock-fill dam, link channels and appurtenant work.

Thermal Power
Gautami Power Project

Maytas Infra entered the power generation sector with the establishment of the 460 MW Gautami Power Project, at Samaralakota, A.P . The company is now developing coal-based and gas-based power projects on EPC and BOT basis.

Power Transmission and Distribution
Maytas Infra has successfully bid for and won various projects in Power Transmission and Distribution. Currently, the company is executing several major electrical works in Madhya Pradesh, Karnataka and Uttar Pradesh that include commissioning and testing of equipment, construction of substations, HT & LT lines.

Oil & Gas
Maytas Infra is constructing the Rajkot-Jamnagar section of the Bhadbhut-Jamnagar pipeline of Gujarat State Petronet Limited, in Gandhinagar, Gujarat. An EPC contract valued at Rs.3.03 billion, the project envisages supply, laying, testing and commissioning of 110 km of pipeline including one dispatch station, four receiving stations and four sectionalizing valve stations.

Other Projects

Upper Indravati Hydro Electric Project
(Kapur Earthen Dam, Podagada Earthen Dam, Diversion Cum Depletion Tunnel, Head Race Tunnel & Masonary Dam)
Orissa

Construction of earthen dam of 537 mts. and 65 mts. at Kapur in the year 1994.
Construction of earthen dam and diversion tunnel of 462 mts. and 72 mts. at Podagada in the year 1996.
Construction of horseshoe shaped diversion tunnel cum depletion outlet 3.5 mts. diameter and 356 mts. at Right Dyke in the year 1997.
Completion of balance work of head race tunnel ( 4 Km. long and 7 mts. diameter) and construction of masonry dam of 65 mts. height, 500 mts. at Muran in the year 1999.

Larji Hydro Electric Project
(Head Race Tunnel & Barrage)
Himachal Pradesh
This project includes construction of head race tunnel of 8.50 M Diametre at Kullu in the year 2004
construction of diversion barrage intake & de-sanding arrangements, coffer dams, de-sanding basins, gate operation galleries, intake structures, gate operation galleries and single gate gallery and 14 Nos. of audit, feeder, d-shaped flushy & connecting tunnels at Kullu 2004.

Parbati Hydro Electric Project
Haryana
Construction of civil and hydro-mechanical works for head race tunnel and associated works at Faridabad, the tunnel is in progress and is being executed for National Hydroelectric Power Corporation Limited, Haryana.

B G Tunnel
Assam
Single line B G including earthwork in filling and cutting and construction of two nos. minor bridges, side drains and other protection works at approaches of tunnel, total length of tunnel is 2596 RM at Maligaon, Assam. This project for Northeast Frontier Railway in under progress.

Hinduja Power Plant
Andhra Pradesh
A Thermal Power Plant including site grading work of 2 X 250 MW plant was executed in the year 2000 for Hitachi Limited, Visakhapatnam.


 