Railway Sidings for M/s Vedanta Aluminium Limited’s Alumina Plant at Lanjigarh, Orissa
Maytas Infra has received an order for construction of Railway Sidings for M/s Vedanta Aluminium Limited’s Alumina Plant at Lanjigarh, Orissa The project consists of 16 km long approach alignment through hilly terrain involving major bridges across rivers and streams, including the perennial river Vamsadhara. It also includes power line crossings and important road crossings, in-plant sidings serving the production and dispatch installations of the alumina complex and remodelling of the Ambodla railway yard for take-off of the siding and additional holding lines with work to be done under running traffic conditions.
Adequate engineering personnel and machinery including giant stone crushers and cranes etc have been deployed at site. Work on major bridges on the alignment and civil works both at the in-plant yard and Ambodla railway yard are in progress. Bulk of the railway permanent-way materials including rails and concrete sleepers for track have been procured. The value of this project is Rs. 103 crores.
Construction of Boundary wall, Roads, Drains, and Earth filling for Byappanahalli Depot, Bangalore
Maytas Infra has been awarded the contract for construction of Boundary wall, Roads, Drains, and Earth filling for Byappanahalli Depot, Bangalore. The project involves site development for metro car shed. The client is Bangalore Metro Rail Corporation Ltd.(BMRC) Bangalore. The project is in progress and the contract value is Rs. 42 crores.
Mass Rapid Transit System, Chennai, Phase-I&II
Maytas Infra has bagged the MRTS, Chennai, Phase-I&II project from Metropolitan Transport Project (Railways), Chennai that involves improvements to passenger amenities and other infrastructure works like building works, bridges, roads, drains and circulating area. The contract value is Rs. 33.955 crores.
Mass Rapid Transit System, Chennai, Phase-II Extension-Construction of pile Foundations and Substructure –Reach-I
Maytas Infra has won the MRTS, Chennai, Phase-II Extension project from Metropolitan Transport Project (Railways), Chennai for construction of pile foundations and substructure –Reach-I. The work involves sub-Structure for elevated railway line, pile foundations, pile caps and piers. The contract value is Rs. 40.271 crores and its location is Velachery to St.Thomas Mound, Chennai.
Mass Rapid Transit System, Chennai, Phase-II Extension-Construction of pile Foundations and Substructure –Reach-II
Maytas Infra has secured the MRTS, Chennai, Phase-II Extension project for construction of pile foundations, pile caps, piers and substructure–Reach-II from Metropolitan Transport Project (Railways), Chennai. The contract value is Rs. 33.241 crores and its location is Velachery to St.Thomas Mound, Chennai.
Mass Rapid Transit System, Chennai, Phase-II Extension-Construction of pile Foundations and Substructure –Reach-III
Maytas Infra has been awarded MRTS, Chennai, Phase-II Extension project for construction of pile foundations, and Substructure –Reach-III from Metropolitan Transport Project (Railways), Chennai. The work involves sub-Structure for elevated railway line, pile foundations, Pile caps and piers. The contract value is Rs. 41.313 crores and its location is Velachery to St.Thomas Mound, Chennai.
Other works awarded and ready to be taken up:
East Coast Railway Vijayanagaram-Kottavalasa
3rd Line :- Maytas Infra will be shortly taking up construction of Vijayanagaram-Kottavalasa 3rd Line on the East-coast Railway. The value of this project is Rs 10 crores
MRTS (Mass Rapid Transit System ) Hyderabad
Maytas Infra is one of the five consortiums to be selected by the Greater Hyderabad Municipal Corporation to bid for the prestigious Metro Rail for the city in the Public-Private-Partnership (PPP) route.
|